Edo. ANZOÁTEGUI, NVA. ESPARTA Y SUCRE

Venezuela

Between 2011-2014, Rafay executed:

  • Construction and commissioning of 175 km of 36″ diameter gas pipeline. Including 13 horizontal perforations. Guiria – Cariaco Quay package 7c and 7d.
  • Installation of two sections of 36″ pipes approximately 40 km long, on a route comprising the Benítez Municipality in Sucre state.

Information of interest

Northeast Gas System aims to build a gas transportation system, with a capacity to handle 1,000 million cubic feet of gas daily as standard, with a pressure of 1200 pounds. It covers the states of Anzoátegui, Nueva Esparta and Sucre.

Back

Información Relacionada