Edo. Anzoátegui
Venezuela
Between 2001-2003, Rafay executed:
- Earth Movements
- Drains
- Pipe Fittings
- Electrical and Instrumentation Works
- Countertop construction
- Underground installations
- Catchment basins
- Well valve housing
- Installation of pipe racks
- Stands for foundations and equipment
- Concrete Structures
Information of interest
The Corrientes Valorization project, which included the expansion of the Puerto La Cruz refinery, was inaugurated in 2004 and will produce per day: 35,000 barrels of unleaded gasoline, 38,000 diesel and 100 tons of sulfur through its new hydrotreatment plants for naphtha, hydrodesulfurization of diesel and amines and sour waters.
Back