Edo. Anzoátegui

Venezuela

Between 1998-2000, Rafay executed:

  • Earth Movements
  • Steel pipes installation 2″- 36″
  • Installation of concrete pipes 36″- 72″
  • Asphalt works
  • Concrete Structures

Information of interest

Operator Cerro Negro performs production and processing of the Orinoco Belt crude oil, compression of the gas-liquid mixture, separation and dehydration of the crude oil, which is transported through 300 km of pipeline to the improver located in José To raise the quality of the oil from 8.5 to 16.0 API.

Back

Información Relacionada